Are you an architect or project planner?
If you are specifying high-speed doors for an industrial or commercial build, our BIM portal is the quickest route to accurate, verified data. Download models in Revit, ArchiCAD or AutoCAD, and the information you need for co-ordination, clash detection and tender documentation comes with them.
EFAFLEX has a dedicated service built around the needs of architects and building planners, from early-stage design through to specification and tender. As well as BIM data, you can access installation drawings with precise key dimensions, current tender texts for every product and one-to-one support from our architecture and planning team.
- BIM download portal: verified 3D models with full technical data in Revit, ArchiCAD and AutoCAD.
- Architects and planners hub: project support, installation drawings and tender preparation.
- Architects service download area: product brochures, tender texts and documentation by door series.
For individually adapted quotation drawings, contact the team at BIM@efaflex.com
What does BIM data from EFAFLEX include?
Every model in the portal has been prepared by our in-house BIM team. The files are not simplified stand-ins, they reflect the real-world geometry and specification of each door, so what you model is what gets built.
The data supports:
- Accurate spatial co-ordination and opening sizing
- Clash detection within your wider building model
- Material and performance data for specification documents
- A consistent information base across design, planning and construction stages
The portal holds a selection from our full range. If you need BIM data for a product not shown above, or require a file configured to specific project parameters, get in touch with the BIM team directly.
View our available BIM models here
Our team can also support you with the full architects service, including tender texts and tailored specification drawings across all door series.
Additional support for architects and planners
EFAFLEX project managers have extensive experience on large-scale industrial builds, both in the UK and internationally. Whether you need design-stage guidance, help with co-ordination drawings or support during tender preparation, the team is available throughout your project.
Find out more about our full range of architect support including how EFAFLEX's approach to innovation and digital planning integrates with modern construction workflows.