York Warehouse Case Study
Client: York Warehouse
Location: York
Sector: Warehouse and Logistics
Products Used: SRT-ECO high-speed roller door (eco)
This client was founded in 1902 and specialises in online retailing of sports equipment and sportswear distributing orders and brands such as Nike, Mitre, and Ziland from their York facility.
They first were introduced to the EFAFLEX brand while visiting the PPMA trade show; seeing our high-speed doors in motion and having the opportunity to sense the build quality and performance.
They had a requirement as part of a refurbishment programme, needing to create a safe, high-speed entry area into their warehouse to cater for busy traffic. Reliability, performance, and endurance were key factors in choosing the product. Having completed a site visit, we recommended our SRT-Eco door, which is ideal for customers looking to create zoned working areas or act as demarcation to minimise contamination or airflow. The SRT-ECO perfectly combines affordable pricing with high levels of quality… without compromise!
The SRT-ECO fabric roll up door requires little specialist structural preparation, and its slimline frames mean that it can be fitted in areas of confined space. The standard sight curtain is semi-transparent for increased user safety, and to ensure an uninterrupted line of site in busy traffic areas where people and machinery work side by side. It’s an ideal solution for warehousing, material, and handling, where speed is crucial, and downtime is costly.
Two SRT-ECO doors were installed and will quickly become an asset for this client, who has taken out a maintenance agreement to ensure longevity and service life for the doors.
The photographs show the preparation stage and final installation.